Within the frameworks of the contract with metallurgical company of Siberia, equipment for a mill 4х13,5 m was dispatched, the total volume of the shipment comprised 15 tons.
Within the frameworks of the contract with metallurgical company of Siberia, equipment for a mill 4х13,5 m was dispatched, the total volume of the shipment comprised 15 tons.