/      

A contract has been signed with our business partners from the Central Asia for the supply of grab bucket drums (4 pcs.), gears (4 pcs.) and sleeves (12 pcs.). The equipment will be manufactured at our company site. 

The hydraulic thrust roller for a rotary kiln has been shipped by our partner in the Southern Federal District, and it has been further repaired at the production site of our company in the City of Volgograd. 

 During a business trip to China the top managers of our company have signed a number of cooperation agreements on the processing equipment design with Shaanxi Technological Institute of Recycling Economy, the leading scientific institute in China, and on the further equipment manufacturing at production sites of China, including CITIC Heavy industries Co., LTD.

 Negotiations with our partners have been held in China. The present and future cooperation questions have been settled. The founder of our company took part in the negotiations.

 A contract for hydraulic thrust roller repair services has been signed with our partners from the Southern Federal District. Defect detection of the hydraulic thrust roller has been performed. Repair and reconditioning are carried out.

A contract for ОР-6600 bearing unit repair services has been signed with our partners from the Southern Federal District. The roller has been shipped for recovery. 

40 segments for 3.2x15m mill partition have been shipped under the contract by our partner from Krasnoyarsk Territory of the Russian Federation. 

A contract has been signed with our Russian partners (from the Ural District) for equipment removal and assembly (4.5x70m tubular rotary kiln) at a processing line for cement production.